![]() |
Главная Случайная страница Контакты | Мы поможем в написании вашей работы! | |
|
1. _____ goods to be considered as delivered at _____ end of _____ elevator spout or when _____ grain passes _____ vessel’s rail and _____ risk shall pass from _____ Sellers to _____ Buyers at _____ same time.
2. _____ Cement shall be loaded by _____ Seller by his means and at his expense according to _____ Cargo Plan to be established between _____ Master of _____ vessel, _____ Seller’s agent or _____ manufacturer of _____ Cement, and _____ authorities of _____ port of loading.
3. _____ design of _____ openings and _____ hatch covers should secure _____ complete tightness of _____ holds during _____ loading.
4. Should _____ vessel not be properly equipped, as above, _____ Seller shall have _____ right to reject _____ vessel, _____ Buyer being fully liable for any consequences.
5. _____ Seller shall provide _____ vessel with _____ safe berth where she can be loaded always afloat, and shall load her at _____ rate of 4000 m/t per _____ weather working day of 24 consecutive hours.
6. _____ first opening and _____ last closing of _____ hatch apertures shall be done by _____ vessel’s crew.
7. _____ connection and _____ disconnection of _____ loading equipment as well as _____ switching of _____ loading equipment from one hatch to another during _____ loading shall be done by _____ Seller’s means and at his expense.
8. The Buyers and/ or Master and/ or Owners’ Agent will tender _____ radio or phone or _____ telex or _____ telegraph 10-, 7-day Notices _____ preliminary ETA and 3-day definite Notice basis New Orlean, Baltimore and/ or other port as the case may be.
9. On _____ receipt of _____ 10-day preliminary Notice the Sellers will advice _____ loading range and on _____ receipt of _____ 7-day preliminary Notice _____ Sellers will nominate _____ loadport in _____ loading range within 48 hours.
10. _____ equipment is to be packed in accordance with _____ loading gauge of _____ Russian railways.
Ex.5. Fill in the blanks with prepositions/ particles where necessary.
1. Delivery _____ the goods _____ the Buyers’ tonnage _____ readiness to be loaded is effected _____ the Sellers.
2. The Cement shall be shipped _____ vessels capable _____ carrying 15 _____ 40 thousand tons _____ Cement each, _____ a draft full laden _____ the port _____ Novorossijsk not exceeding 11.2 metres and an overall length _____ not more than 200 metres, and chartered _____ the Buyer _____ his risk and expense.
3. Data stated _____ the Bill _____ Lading are to be confirmed _____ the official weight certificate.
4. _____ packing all the machined parts _____ the equipment are to be treated _____ special corrosion inhibitors, which may protect the equipment properly, _____ damage _____ transportation and storage.
5. Laytime shall commence _____ 13:00 _____ the same day if the Notice _____ Readiness is tendered _____ noon and _____ 08:00 _____ the following working day if the Notice is tendered _____ the afternoon.
6. The equipment is to be shipped _____ export sea packing suitable _____ the type _____ the equipment to be delivered.
7. The Buyer shall provide _____ the vessels to be fitted _____ openings _____ hatch covers _____ the connection _____ the Seller’s loading equipment.
8. _____ receipt _____ the Free Pratique the Master shall deliver _____ his agent a written Notice _____ Readiness _____ the Seller’s agent _____ office hours.
9. Packing should also be suitable _____ transhipments _____ transit and long storage _____ the goods.
10. _____ case late nomination _____ the loading port results _____ vessel’s delay or deviation all expenses connected _____ such delay or deviation to be _____ the Sellers’ account.
11. Packing is to protect the goods _____ any damage or corrosion _____ their transportation _____ sea, _____ rail and _____ any combination _____ transport facilities.
12. Shipment _____ the outsize cases may be effected only _____ receipt _____ the Buyers’ approval.
Дата публикования: 2015-01-23; Прочитано: 213 | Нарушение авторского права страницы | Мы поможем в написании вашей работы!