Ex.4. Fill in the blanks with articles where necessary. 1. If at ____ Seller’s or ____ manufacturer’s fault ____ quality of ____ Cement delivered under this Contract is inferior to that stipulated in ____ Clause 2



1. If at ____ Seller’s or ____ manufacturer’s fault ____ quality of ____ Cement delivered under this Contract is inferior to that stipulated in ____ Clause 2, ____ Buyer may lodge ____ claim not later than 45 days from ____ date of ____ Bill of Lading.

2. ____ design of ____ openings and of ____ hatches covers shall secure ____ complete tightness of ____ holds during ____ loading.

3. If as ____ result of such circumstances ____ quantity of ____ Cement as per ____ Clause 5 of this Contract has not been delivered in any month, ____ quantity of so short-shipped shall (unless otherwise mutually agreed) be deducted from ____ total quantity to be delivered under this Contract.

4. Should ____ vessel not be properly equipped as above, ____ Seller shall have ____ right to reject ____ vessel, ____ Buyer being fully liable for ____ consequences.

5. Laytime, despatch and demurrage shall be calculated on ____ basis of ____ Statement of Facts signed by ____ Master, ____ Seller’s representative and ____ Ship’s Agent at ____ port of ____ loading.

6. ____ Cement shall be shipped by ____ vessels capable of carrying 15 to 40 thousand tons of ____ Cement each, with ____ draft full laden at ____ port of Novorossiysk not exceeding 11.2 metres and ____ overall length of not more than 200 metres, and chartered by ____ Buyer at his risk and expense.

7. Payment out of ____ Letter of Credit shall be effected at ____ sight against presentation of ____ Seller’s Bank, within 10 days from ____ date of ____ Bill of Lading, of ____ documents as specified in ____ Letter of Credit.

8. ____ Cement sold under ____ present Contract is considered as deliveredby ____ Seller and accepted by ____ Buyer as to ____ quality as per ____ Certificate of ____ Quality issued by ____ Chamber of Commerce and Industry of Russia for each shipment.

9. ____ net price for ____ Cement sold under ____ present Contract is... USD per m/t FOB Novorossiysk.

10. In ____ case of ____ Seller’s refusal or inability to furnish ____ Cement according to ____ schedule agreed upon as per ____ Clause 5, ____ Buyer shall be entitled to claim ____ damages from ____ Seller at ____ rate of 4.00 USD per each metric ton not furnished.

11. ____ vessel shall be admitted within ____ port, piloted and moored according to ____ customs of ____ port of Novorossiysk.

12. ____ claim is to be supported by one original and one copy of ____ Test Report from ____ Harry Stanger Laboratories, London.

13. ____ payment for ____ Cement sold under ____ present Contract shall be effected in ____ US Dollars out of ____ irrevocable Letter of Credit to be opened by ____ Buyer in ____ Seller’s favour.

14. ____ despatch and ____ demurrage shall be settled directly between ____ Buyer and ____ Seller every month.

15. ____ Seller shall provide ____ vessel with ____ safe berth where it can be loaded always afloat, and shall load ____ vessel at ____ rate of 4000 m/t per ____ weather working day of 24 consecutive hours.

Ex.5. Fill in the blanks with prepositions/ particles where necessary.

1. The Seller shall accept and settle such claim ____ 30 days ____ its issue.

2. If as a result ____ such circumstances the quantity ____ Cement ____ ____ Clause 5 ____ this Contract has not been delivered ____ any month, the quantity ____ so short-shipped shall (unless otherwise mutually agreed) be deducted ____ the total quantity to be delivered ____ this Contract.

3. Should a vessel not be properly equipped as above, the Seller shall have the right to reject ____ the vessel, the Buyer being fully liable ____ the consequences.

4. Circumstances ____ force majeure shall relieve the Seller and the Buyer ____ the responsibility ____ non-fulfilment ____ whole or ____ part ____ any obligations specified ____ this Contract ____ the event and ____ the extent that the Seller or the Buyer, as the case may be, shall have been delayed, impeded or frustrated ____ the performance ____ whole or ____ part ____ such obligations.

5. ____ the 10th day ____ each month, the Buyer shall propose the vessels stems ____ the following month.

6. Payment ____ the Cement sold ____ the present Contract shall be effected ____ US Dollars ____ ____ an irrevocable Letter ____ Credit to be opened ____ the Buyer ____ the Seller’s favour.

7. The net price ____ the Cement sold ____ the present Contract is... USD ____ m/t FOB Novorossiysk.

8. All expenses connected ____ the opening, extension and eventual alteration ____ the Letter ____ Credit, as well as the expenses charged ____ the Buyer’s Bank ____ ____ ____ the opening and utilization ____ the Letter ____ Credit, are to be paid ____ the Buyer and ____ the Buyer’s account.

9. Despatch and demurrage shall be settled directly ____ the Buyer and the Seller every month.

10. The Seller shall provide the vessel ____ a safe berth where it can be loaded always afloat, and shall load the vessel ____ the rate ____ 4000 m/t per weather working day ____ 24 consecutive hours.

11. The Cement shall be loaded ____ the Seller ____ his means and ____ his expense ____ ____ a Cargo Plan to be established ____ the Master ____ the vessel, the Seller’s agent or the manufacturer ____ the Cement, and the authorities ____ the port ____ loading.

12. In case the vessel is not loaded ____ the laytime calculated as above the Seller shall pay demurrage ____ the Buyer ____ the rate ____... USD... per....

13. Payment ____ ____ the Letter ____ Credit shall be effected ____ sight ____ presentation ____ the Seller’s Bank, ____ 10 days ____ the date ____ the Bill ____ Lading, ____ the documents as specified ____ the Letter ____ Credit.

14. If the said circumstances ____ force majeure remain operative ____ a continuous period ____ 6 months, either Party shall have the right to cease the Contract and ____ such case neither ____ the Parties shall have the right to claim ____ losses or damages.

15. The cost ____ sampling and postage shall be borne ____ the Seller.

16. The Buyer shall provide ____ the vessels to be fitted ____ openings ____ the hatch covers ____ the connection ____ the Seller’s loading equipment.

17. The vessel shall be admitted ____ the port, piloted and moored ____ ____ the customs ____ the port ____ Novorossiysk.

18. ____ or ____ the 25th day ____ each month the Seller shall confirm the stems ____ the following month.

19. The Seller shall advise the Buyer ____ fax ____ the number and date ____ thepostal receipt.

20. If the vessel is loaded ____ ____the expiration ____ the laytime calculated as above the Buyer shall pay ____ the Seller despatch ____ half demurrage rate ____ day of 24 hours or pro rata ____ any part ____ a day all time saved.





Дата публикования: 2014-10-25; Прочитано: 379 | Нарушение авторского права страницы | Мы поможем в написании вашей работы!



studopedia.org - Студопедия.Орг - 2014-2024 год. Студопедия не является автором материалов, которые размещены. Но предоставляет возможность бесплатного использования (0.007 с)...